The E5 problem

Run Characteristics

Solver  Rtol  Atol  H0  Mescd  Steps  Accept  f-eval  J-eval  LU-dec  CPU-time
BIMD 1.0E-04 1.7E-24 1.0E-06 5.06 169 169 3438 162 169 4.88E-03
1.0E-07 1.7E-24 1.0E-09 9.51 174 174 6409 168 174 8.75E-03
1.0E-10 1.7E-24 1.0E-12 10.53 287 287 10718 282 287 1.46E-02
DASSL 1.0E-04 1.7E-24   failed run
1.0E-07 1.7E-24   7.36 2694 2629 3593 150   1.46E-02
1.0E-10 1.7E-24   failed run
GAMD 1.0E-04 1.7E-24 1.0E-06 5.40 100 99 4855 97 100 5.99E-03
1.0E-07 1.7E-24 1.0E-09 8.25 124 124 9149 121 124 1.15E-02
1.0E-10 1.7E-24 1.0E-12 11.37 160 160 13590 160 160 1.69E-02
MEBDFDAE 1.0E-04 1.7E-24 1.0E-06 4.61 708 704 1091 95 95 4.92E-03
1.0E-07 1.7E-24 1.0E-09 7.42 1333 1329 2008 151 151 9.57E-03
1.0E-10 1.7E-24 1.0E-12 11.28 2260 2258 3298 226 226 1.66E-02
MEBDFI 1.0E-04 1.7E-24 1.0E-06 4.70 626 624 2050 86 86 4.42E-03
1.0E-07 1.7E-24 1.0E-09 7.65 1046 1042 3444 119 119 7.76E-03
1.0E-10 1.7E-24 1.0E-12 10.91 1761 1759 5752 189 189 1.30E-02
RADAU 1.0E-04 1.7E-24 1.0E-06 5.13 100 99 2235 79 100 2.52E-03
1.0E-07 1.7E-24 1.0E-09 8.32 148 145 3123 118 144 3.54E-03
1.0E-10 1.7E-24 1.0E-12 11.67 142 132 5733 106 141 5.85E-03
RADAU5 1.0E-04 1.7E-24 1.0E-06 4.82 202 201 1377 178 199 1.80E-03
1.0E-07 1.7E-24 1.0E-09 8.22 479 478 3322 419 445 4.24E-03
1.0E-10 1.7E-24 1.0E-12 11.11 1170 1166 8210 652 687 9.57E-03


Work-Precision Diagrams

ChartObject Chart 5

Parameters used for the construction of the WPD:  RTOL=10-(4+M/2), M=0,...,16; ATOL=1.7E-24 RTOL; H0=10-2 RTOL.


Problem file